Apartment Complexes & Multi-Family Paving Services
Full parking lot services for apartment communities, condos, and multi-family properties.
What makes apartment parking lots different?
Apartment and multi-family parking lots serve residents 24/7 — there is no closing time, no off-season, and residents need accessible parking at all times. That means every paving and maintenance project must be carefully phased to maintain tenant parking. Speed control (speed bumps and humps), pedestrian safety (crosswalks and lighting), and ADA accessibility are especially important. Deferred maintenance hits apartment properties hard because the lot is in constant use and problems get worse fast.
How does Platinum Paving minimize disruption for apartment communities?
We plan every apartment project with resident parking in mind. We phase the work so tenants always have designated parking available, provide advance notice to management for resident communications, and schedule around move-in/move-out cycles when possible. Our full-service approach means sealcoating, striping, concrete repairs, and accessory installation all happen in one coordinated project — minimizing the number of times your residents are disrupted.
Services for Apartment Complexes & Multi-Family
New Asphalt Paving
Need a new parking lot or pad
Learn MoreAsphalt Overlays
Existing lot deteriorating but base is okay
Learn MoreCommercial Sealcoating
Pavement fading, oxidizing, needs protection
Learn MoreLine Striping & Marking
Faded lines, new layout needed
Learn MoreCrack Sealing
Cracks forming, water getting in
Learn MoreGet a Free Estimate for Your Apartment Complexes Property
Tell us about your property and we'll schedule a free on-site assessment — or call (913) 701-6044.
Apartment Complexes & Multi-Family Paving FAQs
Can you work around tenant parking needs?
Absolutely. We phase the work so tenants always have designated parking available, and we communicate the schedule in advance so management can notify residents.
How often should apartment lot sealcoating be done?
Every 2 to 3 years for most apartment properties. Annual crack sealing between sealcoat cycles keeps water out of the base and extends overall lot life.
Do you handle speed bump installation?
Yes. We install speed bumps, wheel stops, and bollards as part of our parking lot accessories service. These can be added to any paving or maintenance project.
What if our lot has drainage problems?
Poor drainage accelerates asphalt deterioration. We evaluate drainage during every estimate and can regrade, add catch basins, or adjust the lot design to solve water management issues.
Trusted by Apartment Complexes Properties Across KC
530+ commercial projects completed. Full-service paving and concrete. 1-year warranty on every job. Call (913) 701-6044.